Phase 6b Of Deep Water South Tower 1(1a) 42/f
Phase 6b Of Deep Water South Tower 1(1a) 8/f
Phase 6b Of Deep Water South Tower 1(1a) 9/f To 41/f
Phase 6b Of Deep Water South Tower 1(1a) 42/f
Phase 6b Of Deep Water South Tower 1(1b) 42/f
Phase 6b Of Deep Water South Tower 1(1b) 8/f
Phase 6b Of Deep Water South Tower 1(1b) 9/f To 41/f
| Completion Year | about 2027 |
| Area Information | mainly designed into 1-bedroom to 3-bedroom |
| Units | 463 units |
| Blocks | 1 Towers |
| Pri School Net | |
| Sec School Net |